Concrete estimating

Concrete estimating that shows how it got there.

Send a PDF plan set. Get back a complete concrete bid package in 48–72 hours: takeoff workbook, priced proposal, marked-up plan set, RFI list and PM task list. Every quantity states how it was derived and names the sheet it came from.

What a TopOut concrete package contains

Five files, all editable, on your letterhead and at your rates.

  • Takeoff workbook (.xlsx): quantities by element and by operation. Each row names its sheet and how it was derived.
  • Priced proposal (.docx / PDF): your lump sum, your scope and your exclusions, ready to send.
  • Marked-up plan set (PDF): the counted sheets, bubbled where each quantity came from.
  • RFI list (.docx / PDF): the questions the drawings left open, written to send.
  • PM task list (.xlsx): what your PM runs the job from after award.

Nothing is locked. Change any number before you send it.

What we take off, by element

The list, with the unit each element is counted in. The unit is where scope goes missing: formwork factored from volume instead of measured by face, drop caps folded into the deck, a two-face wall counted once.

Foundations — footings, grade beams, pits
Pad and continuous footings, grade beams and pile caps by mark, from the schedule. Elevator and sump pits carried as walls plus a slab.CY · SF · LF · EA
Slab on grade and thickened slabs
Gross area at the scheduled thickness. Thickened edges and interior thickenings on their own lines.CY · SF · LF
Elevated decks and mat pours
By level, at the thickness the section shows. Ramps, toppings and openings on their own lines; opening bulkhead measured as edge form.CY · SF · LF
Columns and pilasters
By mark and level, stopped at the soffit so the deck above is counted once.CY · SF · LF · EA
Shear walls
By mark and level, both faces formed unless the detail says otherwise. Length × height is checked against the stated face area, and a disagreement is reported.CY · SF · LF
Perimeter and retaining walls
One-side or two-side form as the section shows. A one-side form against shoring is its own line.CY · SF · LF
Drop caps and column capitals
Their own line. Folded into the deck or the column, a drop cap is counted twice or lost.CY · SF · EA
Stairs and topping slabs
Cast-in-place flights and landings, and topping over deck or precast, each its own group.CY · SF · LF
Reinforcing — rebar and post-tensioning
From the schedules, by bar size and by element, post-tensioning separate. Unscheduled reinforcing comes back as a declared allowance on its own line.LB · TON
Scope boundaries — masonry, embeds, hardware
CMU, embedded items and hardware are assigned to the trade that carries them, in writing.Named in writing

And by operation, against every element

Each element is also carried by operation, so formwork is a measured contact area rather than a percentage of volume:

  • Formwork: contact area, by face, in SF.
  • Reinforcing: mild steel and PT, in LB and TON.
  • Placement: volume, in CY.
  • Finish: surface area receiving a finish, in SF.
  • Prep: subgrade, vapor barrier, edge and blockout prep, in SF.
  • Joints: construction, control and expansion joints, in LF.

We measure the work. Your rate sheet prices it.No man-hour, crew-day or productivity figure appears anywhere in the takeoff. Every line is a unit you can put a number against.

How we get to the number

Every quantity in the workbook states how it was derived, one of four:

  • Measured: off the drawing. The row names the sheet.
  • From schedule: computed from a schedule the set publishes. The arithmetic is ours, the inputs are the engineer's.
  • Allowance: the drawings are silent, so a stated figure sits on its own line with its basis. Keep it, change it or strike it.
  • Open: unknown. Carried at zero and put on the RFI list.

When a line is not measured, the row says so. The workbook also keeps “this element carries no formwork” apart from “nobody has looked at this element yet”, which is why the open-items list at the back is short.

What the takeoff refuses to doA dimension it cannot parse, a unit in the wrong case, a total that does not tie to its parts: each one stops the run and is reported. A silent repair produces a number that looks fine and cannot be found later.

An estimator reads the whole thing before it leaves. The software counts; the estimator decides what the gaps mean. The method, shown on a real foundation plan, is in the concrete capability PDF.

The five files

The package itself, in the order you open it.

Cast-in-place concrete, CSI Division 3, on one bid. Workbook first.

Demonstration package. The job, drawings, marks, quantities and dollars below were invented for this page. None come from a client and none are a price for real work; we never publish or excerpt a client's plan set or bid documents. What is real is the structure of each document and the DERIVATION field on every workbook row.

1 · Takeoff workbook .xlsx

One row per element, the sheet it came from, and how it was derived. MEASURED: the dimension is on a sheet. FROM SCHEDULE: our arithmetic on the engineer's inputs. ALLOWANCE: the drawings are silent, so a stated figure sits on its own line for you to keep or strike. OPEN: unknown, carried at zero, on the RFI list. A dash in the sheet column means the set does not carry the item. Formwork and open items sit on their own tabs.

TAB 2, CONCRETE QUANTITY SUMMARY · Bay Area 5-story concrete podium multifamily · demonstration data
Mark Description Sheet ref Qty Unit Derivation
FF-1Pad footing, 6'-0" sq. x 24" deep, 34 locationsS2.1090.7CYFROM SCHEDULE
FF-2Pad footing, 8'-0" sq. x 30" deep, 12 locationsS2.1071.1CYFROM SCHEDULE
CF-1Continuous footing, 24" x 18", 612 LFS2.1168.0CYMEASURED
GB-1Grade beam, 18" x 36", 248 LF, garage line B3/S5.0241.3CYMEASURED
EP-1Elevator pit, 12" walls and mat, 6'-0" deep5/S5.022EAMEASURED
SOG-1Slab on grade, 5" over vapor retarder, garageS2.1028,450SFMEASURED
TS-1Thickened slab, 16" x 24" at interior bearing7/S5.02386LFMEASURED
POD-1Podium transfer deck, 14" one-way slab, Level 2S2.2024,900SFMEASURED
ED-1Elevated deck, 8" flat plate, Levels 3 to 5S2.3071,400SFFROM SCHEDULE
DC-1Drop cap, 10'-0" sq. x 10" below deck soffit2/S5.0446EAFROM SCHEDULE
TOP-1Topping slab, 2-1/2" at podium terraceS2.213,180SFMEASURED
C-1Column, 24" x 24", garage to Level 2S3.1038EAFROM SCHEDULE
C-2Column, 18" diameter, Levels 2 to 5S3.1022EAFROM SCHEDULE
SW-1Shear wall, 12" thick, garage to roof, one faceS3.209,860SFMEASURED
PW-1Perimeter wall, 10" thick, 12'-0" highS3.21742LFMEASURED
FW-1Wall formwork, contact area, both facesS3.20, S3.2137,528SFMEASURED
ST-1Stair flight, cast-in-place, 11 risers, 4'-6" wideS6.016EAMEASURED
RB-1Reinforcing, #4 bar, slabs and thickened edgesSG2.01F18,600LBFROM SCHEDULE
RB-2Reinforcing, #5 bar, footings and grade beamsSG2.01F26,400LBFROM SCHEDULE
RB-3Reinforcing, #8 bar, column and boundary cagesSG3.01F31,700LBFROM SCHEDULE
RB-4Reinforcing accessories, chairs, ties and laps4,900LBALLOWANCE
PT-1Post-tension tendons, elevated decks Levels 3 to 5S2.30 Note 6LBOPEN
SUBTOTAL, CY ROWS ABOVE, 271.1 CY · SF, LF, EA AND LB ROWS TOTAL ON THEIR OWN TABS · PT-1 IS OPEN AND CARRIED AT ZERO

Where the RFIs come from, and why they're short

The RFI list falls out of the takeoff: every place the drawings left a question is already an open item on the row that needed it. Two kinds:

  • Missing from the total. An element with no source, a dimension the set never states, a scope the drawings exclude in a note. Named, and left out of the number.
  • Carried with a caveat. A quantity that moves if a schedule is revised, a convention adopted because the set is silent, two sheets that could both be read as the same element. In the total, with the disclosure beside them.

An RFI that can be closed by reading is not an RFIEvery candidate is tested against the whole set first, specifications, geotechnical and civil sheets included, and the sheets are read a second way because text search is blind to a scanned detail. Only the questions that survive go on the list, and each says where we looked.

Where convention and the drawings already agree, the proposal carries a written exclusion rather than a question. Asking a GC who installs something invites the answer: you do.

What we exclude, and why we say so up front

An exclusion list that arrives with the bid is your scope of work. One that arrives after it is a change-order argument. These are the defaults; your proposal prints the ones that apply to your job.

Included

  • Takeoff of everything listed above, by element, operation and sheet
  • Formwork contact area measured by face
  • Reinforcing off the schedules, by bar size and by element
  • A priced, send-ready proposal at your unit rates, with your scope and exclusions written in
  • An RFI list drawn from the gaps and conflicts in the set
  • A PM task list for the job once it's awarded
  • Addenda re-priced against the takeoff already built, quoted as an addition

Not included

  • Mix design, engineering and sealed calculations
  • Any PE stamp (nothing we produce is sealed)
  • Formwork engineering, shoring and reshoring design
  • Rebar placing drawings and bar-bending schedules
  • Material procurement, ready-mix supply and buyout
  • Placing crews, pumps, cranes and field supervision
  • Testing, special inspection and cylinder breaks
  • Crew productivity or man-hour assumptions
  • Pricing for scope not shown on the drawings you send

Where the drawings are silent on something the job will clearly need, it comes back as an RFI and an allowance you can keep or strike.

Every line traces back to a sheet

Every row carries the sheet and detail it came from, S2.1A, 5/S5.02, beside the element, operation, unit and derivation. A GC asks where the shear-wall formwork came from and you answer in seconds. An addendum lands at 4 p.m. and only the rows that touch the affected sheets get re-priced.

Why every row names its sheetAn unreferenced quantity is an opinion. A referenced one is a claim anyone can check against the drawing: your PM, the GC's estimator, or you the night before the bid.

What we need from you

A PDF plan set and your rate sheet. The set as a file or a link: Drive, Dropbox, WeTransfer, a GC's plan room. Any size, no portal. The rate sheet because we carry no rates of our own, and a proposal cannot be priced without one. Three more things help:

  • Your rate sheet. Concrete per CY placed, formwork per SF of contact by type, reinforcing per LB or TON, finishing per SF, pump and pour, markup. Send a past estimate and we read your rates out of it.
  • The bid form and invitation. They name the alternates and bid items the GC expects.
  • Addenda issued so far.
  • The county and awarding agency, so prevailing wage or a project labor agreement is flagged before you price.

Turnaround and rush

48 to 72 hours from when the plan set and your rates land. A 24 to 48-hour rush is +35%. Tell us the bid date and we confirm delivery before starting; if a date is not workable we say so then.

We work from offices in San Jose and San Diego across every county in California, and we take out-of-state sets. Addenda after delivery are re-priced against the takeoff already built and quoted as an addition.

What it costs

Your first concrete package is half price. After that, one price per bid package, quoted before we start:

  • Starter, $550–750. A single scope: a foundation package, a slab on grade, one podium deck.
  • Standard, $950–1,400. A typical commercial bid. One building, footings through decks, with reinforcing.
  • Complex, $1,800–2,900. Multi-building or phased work, or concrete spread across the structural, civil and landscape sheets.

Add 35% for a 24 to 48-hour rush. Send the set and we tell you the band before any work starts.

Why this costs more than a $200 takeoffA concrete quantity list sells online for $150 to $400, and the arithmetic is often fine. What arrives is a spreadsheet. Firms that also write the proposal, the RFIs and the scope publish no price; the one published figure we found for a complete bid package was $1,500 to $5,000. This is that package, from $550, with the number on the page.

Questions concrete subs ask

Do you price the job, or just count it?

Both, at your rates. We measure the work and extend it at the unit rates you send. We carry no rate book.

How accurate is it?

We don't quote an accuracy percentage; a percentage without the method behind it tells you nothing. Every row names its sheet and states how it was derived, and every gap is on the RFI list. Pick a row and check it against the drawing.

What if the drawings are incomplete?

They usually are. Where the set is silent, the gap comes back as an RFI you can send as written, plus an allowance on its own line to keep or strike.

Is formwork measured or factored?

Measured, as contact area by face. Factoring from volume goes wrong exactly where the money is: one-side forms against shoring, tall walls, coffered decks.

What happens when an addendum drops?

Send it. Every row is tied to a sheet, so only what the addendum touched is re-priced, and the delta is called out.

Union or open shop?

Whichever the job is, at your rates. Give us the county and awarding agency and we flag prevailing wage or a project labor agreement before you price.

Is my plan set confidential?

Never shared, never used to bid against you, deleted on request.